My Research

Papers
  - Dreyfuss, M., Giat, Y. (2018) Decision Support Information System for Urban Lighting, Issues in Informing Science and Information Technology, 15, 109-124.
  - Dreyfuss, M., Giat, Y., Stulman, A. (2017) The Window Fill Rate in a Repair Shop with Cannibalization, Computers and Operations Research, 98(1), 13-23
  - Dreyfuss, M., Giat, Y.(2018) The Window Fill Rate with Nonzero Assembly Times: Application to a Battery Swapping Network, Communications in Computer and Information Science, 884, 42-62.
  - Dreyfuss, M., Giat Y. (2018), Optimal allocation of spares to maximize the window fill rate in a two-echelon exchangeable-item repair system. European Journal of Operational Research, 270(3), 1053-1062
  - Dreyfuss, M., Giat Y. (2017), Window Fill Rate with Compound Arrival and Assembly Time. Operations Research Proceedings 2017, Springer, 677-686.
  - Dreyfuss, M., Stulman, A. Waiting Time Distribution for an Exchangeable Item Repair System with Two Failed Components, International Journal of Operational Research, 32(3), 380-396.
  - Dreyfuss, M., Giat, Y. (2018) A Risk Management Model for an Academic Institution’s Information System. Information Resources Management Journal.31(1), 83-96.
  - Dreyfuss, M., Stulman, A. (2018) Waiting Time Distribution for an Exchangeable Item Repair System with Up to Two Failed Components, Annals of Operations Research, 261(1), 167-184
  - Dreyfuss, M., Novik, I. (2017), Enforcing Speed limits Using a Randomization Strategy. Proceedings of OPTIMA 2017, 173-180.
  - Dreyfuss, M. Giat, Y. (2017), Optimal Spares Allocation in an Exchangeable-Item Repair System with Tolerable Wait, European Journal or Operational Research, 584-594.
  - Dreyfuss, M., Giat, Y. (2017), Multi-Echelon Exchangeable-Item Repair System Optimization, Military Operations Research,Vol.22(3),35-49.
  - Dreyfuss, M., Giat, Y. (2017). Optimizing Spare Battery Allocation in an Electric Vehicle Battery Swapping System. ICORES 2017, 38.
  - Dreyfuss, M., Giat Y. (2017), Window Fill Rate in a Two-echelon Exchangeable-Item Repair-System. Operations Research Proceedings 2016, Springer, 293-299.
  - Dreyfuss, M., Giat Y. (2016), Identifying security risk modules in information systems. Proceedings of Informing Science & IT Education Conference (InSite) 2016, 41-51.
  - Dreyfuss, M., Posner, M.J.M. (2014) Determining customer delay in an MB/G/∞ exchangeable item repair system with spares, INFOR, Vol. 52, No. 2, pp.51–58.
  - Rothstein, A., Dreyfuss, M. (2018). Ranking of Elements in System Reliability Modeling: The Least Influence Method, Systems Engineering, 21(5), 501-508.
Forthcoming Papers
  - Dreyfuss, M., Nowik, I.(2018) A puzzled driver is a better driver: Enforcing speed limits using a randomization strategy. - Forthcoming in Journal of Global Optimization.
  - Dreyfuss, M., Stulman, A. Cannibalization in a Repair/Replacement Inventory System. - Forthcoming in Computers and Operations Research
  - Dreyfuss, M., Sher, M. (2018) Policies to reduce road accidents using enforcement cameras.
Other Research
  - Dreyfuss, M., Giat, Y.(2018) Periodic review in a system with customer tolerable wait. - Forthcoming
  - Dreyfuss, M., Ehrman, C.M. (2017) Towards Identifying a Unique Proposition Strategy for Post High School Seminaries: Some new Insights.
  - Dreyfuss, M, Laske, R., Stulman, A. (2018) Cost- effectiveness of cochlear implantation in adults.
  - Dreyfuss, Modeling and Analysis of a variety of Exchangeable-Item Repair Systems with Spares
Paper presentation at conferences
  - 2018: ORSIS Israel, A MILP approach to optimize the fuel problem in a factory
  - 2018: ORSIS Israel, The Window Fill Rate in a Repair Shop with Cannibalization
  - 2017: Optima, Petrovac, Monenegro, Enforcing Speed limits Using a Randomization Strategy
  - 2017: GOR Berlin, Germany, Window Fill Rate with Compound Arrival and Assembly Time
  - 2017: ORSIS Israel, Pooling Spares to Maximize the Window Fill Rate in a Two-echelon Exchangeable-Item Repair-System
  - 2016: GOR Hamburg, Germany, Window Fill Rate in a Two-echelon Exchangeable-Item Repair System
  - 2016: ORSIS Israel, Pooling Spares to Maximize the Window Fill Rate in a Two-echelon Exchangeable-Item Repair-System
  - 2016: ORSIS Israel, Waiting Time Distribution for an Exchangeable Item Repair System with Up to Two Failed Components
  - 2016: ORSIS Israel, ניהול ושיפור אנרגטי של תאורת רחוב
  - 2016: ORSIS Israel, ייעול להקצאת משאבים במעבר משגרה לחירום ברשות המקומיות
  - 2015: ICOR Barcelona,Spain, Fill Rate Window as a Criterion for Spares Allocation
  - 2015: ORSIS Israel, Deployment of cameras of the Israeli Police
  - 2015: ORSIS Israel, Fill Rate Window as Criterion for Spares Allocation
  - 2015: IEM Israel, Multi-echelon Exchangeable-item Repair System Optimization
  - 2012: ORSIS Israel, Customer delay in an Exchangeable MB/G/∞ Repair System with Spares
  - 2008: ORSIS Israel, Optimal Spares Provisioning for an Exchangeable-Item Repair System
  - 2007: ORSIS Israel, Modeling and analysis of Variety of Exchangeable-Item Repair Systems with Spares Provisioning
Paper presentation at seminars
  - 2015: JCT Israel, Customer patience and the optimal spares allocation in a repair system
  - 2015: JCT Israel, Optimal Spares Allocation in an Exchangeable-Item Repair System with Tolerable Wait
Student projects
  - 2018:בעיית מלאי דלק במתקן ביטחוני
  - 2017:הטמעת תהליך S&OP
  - 2017:מחקר ניהול מלאי אופטימלי ובניית מערכת ריזום מקוונת בתורת החיים
  - 2016:הכנת רשות מקומית למצבי חירום
  - 2016:ניהול ושיפור אנרגטי של תאורת רחוב
  - 2015:ייעול פריסת מערך מצלמות האכיפה של משטרת ישראל
  - 2015:חברת עמי תעשיות אלומיניום בע"מ - מהמאה ה 19 למאה ה 21
  - 2015:מודל אופטימיזציה לניהול סיכונים באבטחת מידע
  - 2014:אפיון והטמעת מערכת מידע תוך ייעול תהליכים בחברת "פרש קונספט"
  - 2014: בנייה ואפיון מערכת ניתור וחיזוי אירועים
  - 2014: אפיון ושדרוג "חוות תקוע"מנייר ל-SAP תוך שיפור וייעול מערך היצור
  - 2014: מערכת מידע וייעול מערך התקינה במשרד לשירותי דת
  - 2013: שיטות עבודה וקבלת החלטות לביצוע משימות בחוליית הפקת מידע-אגף משאבי אנוש
  - 2013: ייעול מוקדים טלפונים יד שרה
  - 2013: ייעול נרחב במחלקה לאספקה סטרילית, ביה"ח הדסה עין-כרם
  - 2013: אפיון מחשוב וייעול מערך השידוכים בבג"ט
  - 2012: בניית מפעל סריקה
  - 2010: ייעול מערך התקנים במערך ציוד רפואי
  - 2010: תהליך עיקור בקבוצות מבוסס על התהליך בחדר ניתוח עיניים
  - 2008: פלטפורמה לייצור משחקים חינוכיים